Just one thing missing to allow them to carry on – the track around which the next concrete batches will be poured to give a nice level base for the shed to be erected on.
Who’s going to lay the track – guess!!
After some thought, a true narrow gauge solution was developed – a temporary railway and a trolley; load the trolley with a panel, push down the temporary railway to the site and unload.