We were pleased to welcome our boiler inspector Jonathan Wheeler back to Steamworks this week to carry out the hydraulic test on Blyth.
With his large double needle test gauge mounted on the top of the dome, pressure was raised
We were pleased to welcome our boiler inspector Jonathan Wheeler back to Steamworks this week to carry out the hydraulic test on Blyth.
With his large double needle test gauge mounted on the top of the dome, pressure was raised