Before being taken to Keef’s in August 2020 it had been displayed at Maespoeth Junction on the Corris Railway as part of the fund raising towards the overall four hundred thousand pounds cost of building the locomotive which will become No.
With the boiler out of the frames for the hydraulic test it was possible to look to mounting the ashpan, made by Keef’s from a wooden pattern constructed by a Corris Railway volunteer.
This work is estimated to cost forty eight thousand pounds with the Corris Railway still needing to raise twenty thousand pounds to reach this target.