The firebox tube plate has been polished ready for the magnetic particle and wall thickness inspection on the 19th February.
The inspection will include both tube plates and all the welded seams inside the firebox, around the hollow stays (for the GPCS) and the wash out plug holes.
Our gallery also shows the new tubes being annealed and the condition of the stays in the water space between the inner and outer firebox.