The whistle has now been fitted at the front of the cab, this is a modified version of an SAR type to produce a more “American” style sound.
Our general pictures show the clack boxes that have been fitted to the boiler and work continues with piping.
A lot of detail work is still needed before the first steam test expected in December plus the final assembly of the tender with the fitment of the tank to the newly built tender frame.