The boiler section of number 49 has now arrived in Johannesburg at Reefsteamers where it was offloaded by the Reefsteamers crane.
Here it will be lifted by the workshop gantry crane from the DZ and placed on blocks for the retubing to begin shortly.
Our pictures from Reefsteamers show 12AR 1535 hauling the crane into position and the lifting process from the lowbed to the DZ.