News Archive

NG10 number 61. On to the finish!

Published and found at

With the boiler now mounted and positioned correctly in the frames work has begun on fitting the lagging and cladding to the boiler together with the boiler rings.

Our pictures show the final bolt hole being drilled for the boiler in the smoke box saddle, the boiler with the boiler rings and the first lagging in place plus one of the boiler rings.

Set valve timing Fit all boiler mounts and cab fittings.

Read the full article