As if that wasn’t enough, most of the party then went onto to digging and spoil recovery on the Field Railway near the re-graded section.
This used the spoil from the re-grading exercise to extend and stabilise the low embankment on which the railway runs in that locale, including making a proper area for a point lever to stand.
The previous point lever used to hover in air in a slightly strange and unnerving fashion!