While the Bloemfontein team awaits the boiler from Keith Steven’s Workshop, Lukas and the team are stripping the tender frame of number 61.This is in very poor condition due to rust and previous accident damage.
Both ends of the tender will be renewed with new draw gear and drag boxes.