So, the main project has been improving rail access to a container which contains a number of the operational locos.
Road tailings have been railed to site – which is inaccessible to everything except foot and rail – and tipped to improve the ground conditions.
The points have a very shallow crossing angle, so the tracks diverge slowly; this is essential, because the tracks are not far apart in the container.