This turnout was installed at a lower level to facilitate future work in this area.
(These few words does not seem to do justice to the work involved).
A small but perfectly formed gang laid a length of the north side hedge between 5 ½ -5 ¾ mileposts – make sure you admire their hard work the next time you travel up the line.