By mid afternoon we had drilled the remaining 60 sleepers required for the section between Quarry Siding and Dolgoch.
With everything set up progress was swift and we had 66 of the sleepers required for Februaries work on Cynfal bank drilled by lunch time.
The gang were on a roll and we had them drilled in very quick order so we were able to drill the 35 sleepers required for the BS50 section rails at the same location.