- Continued with paintwork repair on the boiler barrel No 4 Edward Thomas - Prepped and painted the front and rear buffer beams.
- Installed both mudholes (the boiler plugs had already been fitted).
- Fitted fusible plugs - Moved ashpan into the works, ready for some repair work - The engine is now ready for hydraulic test.